Profitec Pro 500: Adjusting the Pressure Stat

Tools Needed: 2.5mm Allen Key Flathead screwdriver 1. Remove the top panel of the machine with the 2.5mm allen key. 2. Remove the yellow cap from the pressure stat located on the right side of the machine if standing in front of it. 3. While the...

Profitec Pro 500: Group Head Cleaning and Maintenance

Profitec Pro 500: Removing the Pressure Stat

Tools needed: 17mm wrench 2.5mm allen wrench 3mm allen wrench Phillips screwdriver 1. Remove the panels from the machine by following along with our guide: Pro 500 Panel Removal 2. Remove the top cap of the pressure stat to unveil the screws...

Profitec Pro 500: Heating Element Replacement

Before doing this we recommend draining the machine, unplugging it and allowing it to fully cool off. Tools Needed: 2.5mm Allen Wrench 3mm Allen Wrench 13mm Wrench or 13mm Deep Socket and Ratcheting Wrench 17mm Wrench 1400W Element (if replacing)...

Profitec Pro 500: Removing or Replacing Steam Gauge

Tools Needed: 2.5mm Allen wrench 3mm Allen wrench 13mm + 14mm wrenches, or two adjustable wrenches To purchase a steam gauge for your Profitec Pro 500, visit our site here. 1. Allow the machine to fully cool down, unplug it and remove the water...

Profitec Pro 500: Removing or Replacing Brew Gauge

Tools Needed: 2.5mm Allen wrench 3mm Allen wrench 13mm + 14mm wrenches, or two adjustable wrenches To purchase a steam gauge for your Profitec Pro 500, visit our site here. 1. Allow the machine to fully cool down, unplug it and remove the water...

Profitec Pro 500 PID: Resetting Safety Switches

Tools Needed: 2.5mm Allen Key NOTE: Start with the machine unplugged and cool to the touch.1. Remove the top panel of the machine with a 2.5mm allen key, taking out the 4 screws in the top panel. 2. Press the two buttons on the safety switches to...

Profitec Pro 500: Replacing the SSR

What you'll need: - 2.5mm hex screwdriver- 3mm hex screwdriver- Replacement SSR To begin you'll need to turn your machine off and remove the panels. With the panels removed, you can find the relay on the right-hand side of the machine, just on top...

Profitec Pro 500: Inspecting/cleaning the Fill Probe

Tools Needed: - 3mm allen key- Small adjustable wrench- Wire brush or scouring pad 1) First you'll need to turn off your machine and remove the top panel to expose the boiler. 2) With the top panel removed, you can locate the fill probe. 3) Unplug...

Profitec Pro 500: Cleaning the Temperature Probe

Tools Needed - 2.5 mm allen key - 3 mm allen key - Adjustable wrench- Scouring pad or wire brush- PTFE Tape (plumber's tape) 1) Remove the panels 2) Locate the temperature probe on the right side of the boiler. 3) Follow the wires from the probe...

Profitec Pro 500: Vacuum Breaker Inspection and Service

Before doing this we recommend allowing the machine to fully cool off and unplugging the machine. Tools required: 3mm Allen key or hex driver 17mm wrench or adjustable wrench Highly recommended: 17mm deep socket and socket wrench with extension A...