Clive Coffee logo
Clive Coffee logo

All articles

Troubleshooting

ECM Synchronika: Steam Boiler Not Heating

Tools needed: 2.5mm allen key Multimeter with continuity reading capability 1. The steam boiler switch is off. The first thing to look at if the steam boiler on your ECM Synchronika is not heating is the switch to power the boiler on. This is...

ECM Synchronika: Brew Boiler Not Heating

Tools Needed: 2.5mm Allen Key Multimeter with continuity test function 1. The Synchronika needs more time to reach full temperature. The ECM Synchronika takes around 20 minutes to fully heat, so ensure you've allowed enough time for the machine to...

ECM Synchronika: PID Won't Turn On

Tools Needed: 2.5mm Allen Key 1. The power switch is not on. Make sure the power switch, located on the front left of the machine and below the PID, is in the up position, and the green light is also illuminated. 2. The Synchronika is in the wrong...

ECM Synchronika: Green Control LED Light Inspection and Replacement

Tools Needed:- 3mm Allen key or Hex driver - Replacement Control Light1. Remove the left-side panel from the machine by unscrewing the indicated Allen screw. Then pull the panel out and away from the machine; set aside.2. Identify the rear of the...